The 8th ACFA-HPPA mini-workshop
from
Monday, September 23, 2024 (8:00 AM)
to
Tuesday, September 24, 2024 (7:10 PM)
Monday, September 23, 2024
8:00 AM
8:00 AM - 9:00 AM
9:00 AM
9:00 AM - 9:20 AM
9:20 AM
9:20 AM - 10:50 AM
10:50 AM
Coffee Break
Coffee Break
10:50 AM - 11:20 AM
11:20 AM
11:20 AM - 12:20 PM
12:20 PM
Lunch
Lunch
12:20 PM - 2:00 PM
2:00 PM
Contributed I (Future upgrade)
Contributed I (Future upgrade)
2:00 PM - 3:20 PM
14:00 ~ 14:20 High-intensity beyond 1 MW beam operation with minimum beam loss at J-PARC RCS (Pranab Saha, J-PARC) 14:20 ~ 14:40 High-intensity operation of J-PARC Main Ring (Takaaki Yasui, KEK) 14:40 ~ 15:00 New painting scheme and upgrade progress for the CSNS injection system (Mingyang Huang,IHEP) 15:00 ~ 15:20 CSNS-II LINAC energy upgrade (Huachang Liu, IHEP)
3:20 PM
Contributed II (Beam dynamics)
Contributed II (Beam dynamics)
3:20 PM - 4:20 PM
15:20 ~ 15:40 Dominance of Particle Resonances over Parametric Instabilities in High-Intensity Linear Accelerators (Dong-O JEON, IRIS) 15:40 ~ 16:00 Source of instability in the RCS of CSNS(Liangsheng HUANG, IHEP) 16:00 ~ 16:20 Study on the random resonance for further beam power ramp-up in J-PARC RCS (Kunihiro Kojima, J-PARC)
4:20 PM
Coffee Break
Coffee Break
4:20 PM - 4:50 PM
4:50 PM
Contributed III (Superconducting)
Contributed III (Superconducting)
4:50 PM - 5:50 PM
16:50 ~ 17:10 Low beta superconducting cavity system for HIAF iLinac (Tiancai JIANG, IMP) 17:10 ~ 17:30 Design, Fabrication, Assembling and Testing of QWR/HWR Cryomodules for HIAF Project (FENG BAI, IMP) 17:30 ~ 17:50 RAON Superconducting linac(TBD,IRIS)
5:50 PM
Banquet
Banquet
5:50 PM - 6:50 PM
Tuesday, September 24, 2024
9:00 AM
Contributed IV (RF system)
Contributed IV (RF system)
9:00 AM - 9:40 AM
09:00 ~ 09:20 Development of Solid-state Amplifier for Accelerator Project Based on the New Concept and Technologies in IMP (LIEPENG SUN ,IMP) 09:20 ~ 09:40 Beam Commissioning Overview: Dual Harmonic RF System at CSNS Rapid Cycling Synchrotron (Hanyang Liu, IHEP)
9:40 AM
Contributed V (IS/Control)
Contributed V (IS/Control)
9:40 AM - 10:40 AM
09:40 ~ 10:00 Online Control of CAFe II based on Reinforcement Learning (Xiaolong Chen,IMP) 10:00 ~ 10:20 Long life-time RF-driven negative hydrogen ion source and its emittance optimization (Weidong Chen, IHEP) 10:20 ~ 10:40 The machine protection system for CSNS accelerator (Yongcheng He ,IHEP)
10:40 AM
Coffee Break
Coffee Break
10:40 AM - 11:10 AM
11:10 AM
Contributed VI (Application)
Contributed VI (Application)
11:10 AM - 12:30 PM
11:10 ~ 11:30 Beam Test Stand at KOMAC (Han sung Kim, KOMAC) 11:30 ~ 11:50 ISOL system for RAON (Yun, IRIS) 11:50 ~ 12:10 Nuclear data production system for RAON (Halm, IRIS) 12:10 ~ 12:30 Design study of a high-current K100 compact cyclotron for H2+ acceleration (Jongwon Kim, IRIS)
12:30 PM
Lunch
Lunch
12:30 PM - 2:00 PM
2:00 PM
Facility tour
Facility tour
2:00 PM - 5:00 PM