The 8th ACFA-HPPA mini-workshop

Asia/Seoul
2F - 3F (IBS Science culture center(2F, Auditorium))

2F - 3F

IBS Science culture center(2F, Auditorium)

55, Expo-ro, Yuseong-gu, Daejeon, Korea, 34126
Participants
  • Danhye Gil
  • Donghyun Kwak
  • Geonhee Oh
  • Han-Sung KIM
  • Hanyang Liu
  • Heetae Kim
  • Hyung Jin Kim
  • IN-SEOK HONG
  • Jae-Sang Lee
  • Jaehong Kim
  • Jaesung Kim
  • Jeong-il Heo
  • Ji-Ho Jang
  • Jong-Won Kim
  • Kyoungho Tshoo
  • LIEPENG SUN
  • Mingyang Huang
  • Minyoung Youn
  • Myeun Kwon
  • PRANAB SAHA
  • Sang-gil Lee
  • Seong Jae Pyeun
  • Seung Woo Hong
  • SOL HEO
  • Sukjin Choi
  • Taeksu Shin
  • Takatoshi Morishita
  • Xiaolong Chen
  • Yeonsei Chung
  • +14
  • Monday, 23 September
    • 08:00 09:00
      Registration IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

    • 09:00 09:20
      Opening IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      09:00 ~ 09:10 Welcome address (Dr. Seung Woo Hong, IRIS)
      09:10 ~ 09:20 Convener opening address (Dr. Sheng Wang, IHEP)

    • 09:20 10:50
      Plenery I IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      09:20 ~ 09:50 The Status of CSNS and Its Upgrade Project CSNS-II (Sheng Wang, IHEP)
      09:50 ~ 10:20 Beam Commissioning Results of the RAON Superconducting Linac with argon beams (Ji-Ho Jang, IRIS)
      10:20 ~ 10:50 High intensity operation of J-PARC accelerators and future upgrades (Takatoshi Morishita, J-PARC)

    • 10:50 11:20
      Coffee Break 30m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

    • 11:20 12:20
      Plenary II IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      11:20 ~ 11:50 KOMAC Linac Status (Hyeok Jung Kwon, KOMAC)
      11:50 ~ 12:20 Study on high availability method of high power superconducting linac based on café (Shuhui Liu, IMP)

    • 12:20 14:00
      Lunch 1h 40m
    • 14:00 15:20
      Contributed I (Future upgrade) 1h 20m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      14:00 ~ 14:20 High-intensity beyond 1 MW beam operation with minimum beam loss at J-PARC RCS (Pranab Saha, J-PARC)
      14:20 ~ 14:40 High-intensity operation of J-PARC Main Ring (Takaaki Yasui, KEK)
      14:40 ~ 15:00 New painting scheme and upgrade progress for the CSNS injection system (Mingyang Huang,IHEP)
      15:00 ~ 15:20 CSNS-II LINAC energy upgrade (Huachang Liu, IHEP)

    • 15:20 16:20
      Contributed II (Beam dynamics) 1h IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      15:20 ~ 15:40 Dominance of Particle Resonances over Parametric Instabilities in High-Intensity Linear Accelerators (Dong-O JEON, IRIS)
      15:40 ~ 16:00 Source of instability in the RCS of CSNS(Liangsheng HUANG, IHEP)
      16:00 ~ 16:20 Study on the random resonance for further beam power ramp-up in J-PARC RCS (Kunihiro Kojima, J-PARC)

    • 16:20 16:50
      Coffee Break 30m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

    • 16:50 17:50
      Contributed III (Superconducting) 1h IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      16:50 ~ 17:10 Low beta superconducting cavity system for HIAF iLinac (Tiancai JIANG, IMP)
      17:10 ~ 17:30 Design, Fabrication, Assembling and Testing of QWR/HWR Cryomodules for HIAF Project (FENG BAI, IMP)
      17:30 ~ 17:50 RAON Superconducting linac(TBD,IRIS)

    • 17:50 18:50
      Banquet 1h IBS-SCC 3F south wing

      IBS-SCC 3F south wing

  • Tuesday, 24 September
    • 09:00 09:40
      Contributed IV (RF system) 40m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      09:00 ~ 09:20 Development of Solid-state Amplifier for Accelerator Project Based on the New Concept and Technologies in IMP (LIEPENG SUN ,IMP)
      09:20 ~ 09:40 Beam Commissioning Overview: Dual Harmonic RF System at CSNS Rapid Cycling Synchrotron (Hanyang Liu, IHEP)

    • 09:40 10:40
      Contributed V (IS/Control) 1h IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      09:40 ~ 10:00 Online Control of CAFe II based on Reinforcement Learning (Xiaolong Chen,IMP)
      10:00 ~ 10:20 Long life-time RF-driven negative hydrogen ion source and its emittance optimization (Weidong Chen, IHEP)
      10:20 ~ 10:40 The machine protection system for CSNS accelerator (Yongcheng He ,IHEP)

    • 10:40 11:10
      Coffee Break 30m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

    • 11:10 12:30
      Contributed VI (Application) 1h 20m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

      11:10 ~ 11:30 Beam Test Stand at KOMAC (Han sung Kim, KOMAC)
      11:30 ~ 11:50 ISOL system for RAON (Yun, IRIS)
      11:50 ~ 12:10 Nuclear data production system for RAON (Halm, IRIS)
      12:10 ~ 12:30 Design study of a high-current K100 compact cyclotron for H2+ acceleration (Jongwon Kim, IRIS)

    • 12:30 14:00
      Lunch 1h 30m IBS-SCC Auditorium(2F)

      IBS-SCC Auditorium(2F)

    • 14:00 17:00
      Facility tour 3h RAON facility

      RAON facility