Description
14:00 ~ 14:20 High-intensity beyond 1 MW beam operation with minimum beam loss at J-PARC RCS (Pranab Saha, J-PARC)
14:20 ~ 14:40 High-intensity operation of J-PARC Main Ring (Takaaki Yasui, KEK)
14:40 ~ 15:00 New painting scheme and upgrade progress for the CSNS injection system (Mingyang Huang,IHEP)
15:00 ~ 15:20 CSNS-II LINAC energy upgrade (Huachang Liu, IHEP)